Product Description:
This product is a two-component floor paint, with A component (colour paint) and B component (curing agent) composed of two parts of thick slurry coating, high solid content, good abrasion resistance, strong hardness, good film fullness, good flow and spreadability.
Application:
1. Before use, the A component (colour paint) should be fully stirred with an explosion-proof mixer, high-speed mixing for 1-3 minutes is suitable for the A component (colour paint) due to long storage time and precipitation must be stirred evenly after use.
2. A component (colour paint) and B component (curing agent) by the proportions suggested by the packaging label, the use of a standard weighing device to ensure its accuracy after mixing, can not be arbitrarily mixed, so as not to affect the curing effect of the material.
3. Mixed AB components, must be mixed with high-speed mixing, generally mixing 2-3 minutes. Mixed materials in the construction of the temperature above 25 ℃, within 20 minutes to use up the best. The shorter the storage time, the better the effect.
4. will mix the mixed material poured on the pre-construction ground, with a professional scraper evenly scraped, in the process of just scraping there will be traces of the scraper, but after 20 minutes the traces will naturally disappear, forming a plane without a trace!
Precautions:
1. This product belongs to flammable chemicals, please keep it away from fire, The mixer should use the explosion-proof motor.
2. This product is stored in a cool, ventilated place, not in the sun.
3. Do not use the product temperature below 5 ℃ construction, the temperature is too low to affect the curing time. Humidity should not exceed 70% appropriate, if moisture is too large paint film surface will appear to be whitening and uneven colour.
4. The use of low temperatures, the viscosity of the material, if large, can be mixed according to the total amount of AB 1-2% of the addition of special diluent use.
5. If the material is accidentally splashed into the eyes during the construction process, it should be flushed with water in time and sent to the hospital for treatment.